A customer wanted the opportunity to produce district heating without having to run the turbine.
The project consisted of one new direct condenser with control valves, of which the control valves were supplied by Askalon.
The equipment consists of a steam conditioning station with dump tube. A dump tube was required as the downstream straight piping to the condenser was short. Valves for level control were also included. Upstream the control valves, quick-closing shut-off valves according to SIL2 were installed. The entire assembly was welded together into one unit in our workshop. Other valves were delivered as single components.